Installation checklist

Start with the gate.
Check the whole site.

A front-view photo alone cannot establish compatibility. Review the structure, full gate movement, power, connectivity and maintenance conditions before agreeing an installation plan.

Zhihui Fanqie full-color screen: product structure illustrationAn independent narrow LED screen above the existing advertising panel, with the support on the left and the upright gate cabinet on the right. Illustration only; dimensions and installation depend on the site. FULL-COLOR SCREEN · COMMUNITY PLATFORMMake local information more visible.Connect local information with the physical spaces around you.
Product structure illustration. The new LED screen is the narrow unit at the top; the large panel below represents the existing advertisement. Drawing proportions are not physical specifications.

1. Gate structure and movement

Provide the existing gate model and available technical information, plus overall, front, side and cabinet-area photographs. Identify the proposed display position and mounting space.

The actual equipment and installation providers should review mounting, drive, counterbalance, operating clearance and maintenance access. Space for the display does not establish compatibility for the complete gate.

2. Power, wiring and protection

Identify the available power supply, connection point and cable route. Power specifications, protection and installation work must be confirmed for the site.

Check whether power modifications, wiring, accessories and installation labour are included in the quotation.

3. Connectivity and content management

Describe the available network and signal conditions. Confirm the communications module, connection method, content management system, account access and setup for the selected configuration.

Agree who will update content, review feedback and handle faults. Integration with the new community software depends on its accepted and available scope.

4. Delivery and ongoing responsibilities

Agree installation timing, access arrangements, maintenance space and the responsible parties. List equipment, installation, delivery and after-sales scope in the confirmed quotation.

Please contact us to confirm which supply, shipping and installation arrangements are available for your location.

About this checklist

This English page is translated and edited from the company’s confirmed product material and Chinese installation checklist. It is preparation guidance, not a site-specific construction design. Updated 9 October 2026. AI-assisted translation was reviewed against the confirmed Chinese source.

Contact the team

Let’s discuss your site.

Tell us your location, gate details and what you need. We’ll help you find the right plan.

Email us

Free consultation. Equipment, installation and delivery quoted separately.

WeChat

Tomato-CX666666

Douyin

82844529077

Contact us Call us

Let’s discuss your project

How would you like
to contact us?

Free consultation. Equipment and installation are quoted separately.

WeChat

Tomato-CX666666

Douyin

82844529077

Contact details and preparation