1. Gate structure and movement
Provide the existing gate model and available technical information, plus overall, front, side and cabinet-area photographs. Identify the proposed display position and mounting space.
The actual equipment and installation providers should review mounting, drive, counterbalance, operating clearance and maintenance access. Space for the display does not establish compatibility for the complete gate.
2. Power, wiring and protection
Identify the available power supply, connection point and cable route. Power specifications, protection and installation work must be confirmed for the site.
Check whether power modifications, wiring, accessories and installation labour are included in the quotation.
3. Connectivity and content management
Describe the available network and signal conditions. Confirm the communications module, connection method, content management system, account access and setup for the selected configuration.
Agree who will update content, review feedback and handle faults. Integration with the new community software depends on its accepted and available scope.
4. Delivery and ongoing responsibilities
Agree installation timing, access arrangements, maintenance space and the responsible parties. List equipment, installation, delivery and after-sales scope in the confirmed quotation.
Please contact us to confirm which supply, shipping and installation arrangements are available for your location.
About this checklist
This English page is translated and edited from the company’s confirmed product material and Chinese installation checklist. It is preparation guidance, not a site-specific construction design. Updated 9 October 2026. AI-assisted translation was reviewed against the confirmed Chinese source.

